Advertisement
Continue Reading Below
Building Permits
To date, we have no information about building permits in 2025
Feb 5, 2016
Description: Installation of new boiler remove existing and install new
- Contractor: Owen T. Graves
- Valuation: $30,000
- Fee: $38.00 paid to City of Boston, Massachusetts
- Client: Cunningham Catherine A & Corvell
- Parcel #: 1704313000
- Permit #: G560946
Feb 5, 2016
Description: Installation of new combi heat and hot water system
- Contractor: Owen T. Graves
- Valuation: $400,000
- Fee: $25.00 paid to City of Boston, Massachusetts
- Client: Cunningham Catherine A & Corvell
- Parcel #: 1704313000
- Permit #: PL560952
Feb 23, 2010
Description: Remodel kitchen and update some some piping
- Contractor: Owen T. Graves
- Valuation: $150,000
- Fee: $45.00 paid to City of Boston, Massachusetts
- Client: Cunningham Catherine A & Corvell
- Parcel #: 1704313000
- Permit #: PL13797
Feb 23, 2010
Description: Moving gas stove to the left 2 feet exixsting gas hookup for new dryer
- Contractor: Owen T. Graves
- Valuation: $40,000
- Fee: $20.00 paid to City of Boston, Massachusetts
- Client: Cunningham Catherine A & Corvell
- Parcel #: 1704313000
- Permit #: G15825
Feb 17, 2010
Description: Electrical: adding plugs, lights and switches
- Contractor: Leahy Peter
- Valuation: $220,000
- Parcel #: 04313-000
- Permit #: E15106
Feb 17, 2010
Description: Adding smoke detectors and carbon sencers
- Contractor: Peter E. Leahy
- Valuation: $80,000
- Fee: $17.00 paid to City of Boston, Massachusetts
- Client: Cunningham Catherine A & Corvell
- Parcel #: 1704313000
- Permit #: EFA15107
Jan 4, 2010
Description: Intext: re shingle roof,re-side home with vinyl siding, install 23 replacement windows, install (2) new entry doors. replace existing steps to side entry porch with pressure treated landing, steps and railings, if required. install new gutters and downspouts. i
- Valuation: $7,677,500
- Fee: $777.00 paid to City of Boston, Massachusetts
- Parcel #: 04313-000
- Permit #: SF3437
Fuller St Fire Incident History
To date, we have no information about fire incidents in 2025
26 Aug 2017
Natural vegetation fire, other
Property Use —
Outside or special property, other
Area of Origin —
Other
First Ignition —
Light vegetation - not crop, including grass
Heat Source —
Heat source: other
11 Aug 2017
Fire, other
Property Use —
Multifamily dwellings
Area of Origin —
Cooking area, kitchen
First Ignition —
Furniture, utensils, other
Heat Source —
Radiated, conducted heat from operating equipment
08 Dec 2016
Building fires
Property Use —
Multifamily dwellings
Area of Origin —
Outside area, other
First Ignition —
Exterior wall covering or finish
Heat Source —
Radiated heat from another fire
05 Jan 2016
Building fires
Property Use —
1 or 2 family dwelling
Area of Origin —
Function area, other
First Ignition —
Structural component or finish, other
Heat Source —
Hot or smoldering object, other
Fuller St Incidents registered in FEMA
(Federal Emergency Management Agency)
To date, we have no information about incidents registered in FEMA in 2025
25 Dec 2015
Cooking fire, confined to container
Property Use —
1 or 2 family dwelling
14 Dec 2015
Outside rubbish, trash or waste fire
Property Use —
Outside or special property, other
21 Nov 2015
Cooking fire, confined to container
Property Use —
Multifamily dwellings
29 Sep 2015
Cooking fire, confined to container
Property Use —
Residential, other
Properties Nearby
| Street Address |
|---|
6 Fuller St, Boston, MA Single Family
|
52 Fuller St, Boston, MA Multiple Occupancy
|
55 Fuller St, Boston, MA Single Family
|
59 Fuller St, Boston, MA Single Family
|
62 Fuller St, Boston, MA Multiple Occupancy
|
64 Fuller St, Boston, MA Multi Family
|