Advertisement
Continue Reading Below
Building Permits
To date, we have no information about building permits in 2025
Aug 27, 2013
Description: Movetrucks
- Fee: $63.00 paid to City of Boston, Massachusetts
- Parcel #: 03403-000
- Permit #: OCCU-280281
May 22, 2013
Description: Addition: adding a bedroom and bathroom
- Valuation: $500,000
- Fee: $35.00 paid to City of Boston, Massachusetts
- Parcel #: 03403-000
- Permit #: PL246487
May 20, 2013
Description: Electrical: wire new master bedroom, master bathroom, and dining room
- Contractor: Sorrentino Michael
- Valuation: $800,000
- Parcel #: 03403-000
- Permit #: E245741
Feb 7, 2013
Description: Addition: construct a new one story addition in rear yard. remove a portion of the existing open deck along the side yard, and rebuild a new deck which conforms with the side yard se
- Valuation: $11,000,000
- Parcel #: 03403-000
- Permit #: ALT218461
May 11, 2011
Description: Replace boiler
- Contractor: Vincent C. Forsythe
- Valuation: $700,000
- Fee: $30.00 paid to City of Boston, Massachusetts
- Client: Vanzandt Janet
- Parcel #: 1103403000
- Permit #: PL76374
May 11, 2011
Description: Gas pipe 2 boilers
- Contractor: Vincent C. Forsythe
- Valuation: $200,000
- Fee: $43.40 paid to City of Boston, Massachusetts
- Client: Vanzandt Janet
- Parcel #: 1103403000
- Permit #: G76371
Jun 24, 2010
Description: Roof: strip roofing in designated area install ice shield venting and 25 year asphalt roofing
- Valuation: $865,000
- Fee: $97.00 paid to City of Boston, Massachusetts
- Parcel #: 03403-000
- Permit #: SF31270
Saint Rose St Fire Incident History
To date, we have no information about fire incidents in 2025
26 Sep 2018
Building fires
Property Use —
Multifamily dwellings
Area of Origin —
Cooking area, kitchen
First Ignition —
Electrical wire, cable insulation
Heat Source —
Arcing
12 Oct 2017
Building fires
Property Use —
Multifamily dwellings
Area of Origin —
Bathroom, checkroom, lavatory, locker room
First Ignition —
Electrical wire, cable insulation
Heat Source —
Arcing
29 Dec 2016
Building fires
Property Use —
Multifamily dwellings
Area of Origin —
Cooking area, kitchen
First Ignition —
Household utensils
Heat Source —
Radiated, conducted heat from operating equipment
26 Jun 2015
Building fires
Property Use —
1 or 2 family dwelling
Area of Origin —
Bedroom - < 5 persons; included are jail or prison
First Ignition —
Mattress, pillow
Heat Source —
Radiated, conducted heat from operating equipment
Saint Rose St Incidents registered in FEMA
(Federal Emergency Management Agency)
To date, we have no information about incidents registered in FEMA in 2025
30 Jun 2015
Carbon monoxide incident
Property Use —
Multifamily dwellings
14 Apr 2015
Outside rubbish fire, other
Property Use —
Residential street, road or residential driveway
09 Jan 2015
Power line down
Property Use —
Outside or special property, other
04 Jan 2015
Carbon monoxide incident
Property Use —
Multifamily dwellings
Properties Nearby
| Street Address |
|---|
5 Saint Rose St, Boston, MA Multiple Occupancy
|